Jacon 5000 Transmixer
Extensively overhauled. Including but not limited to:
- New mixer bowl
- New mixer bowl transmission
- Extensively rewired including new ECM and overhauled PLC
- Extensively rehosed
- Overhauled drive pumps
- Rebuilt/new chute system
- All suspension bushing replaced along with tie rods
- Fully overhauled cooler pack. New core.
- Fully specd for underground operation
- Site specific mods to Rio Tinto underground spec
Comes with an extensive critical spares list
Latest News
Simba M7C sold to Macmahon Holdings
Simba M7C sold after extensive repairs requested by Macmahon Holdings
1700G parts available SERVICE EXCHANGE
8XZ series Elphinstone R1700G All components available on exchange basis. Cab Chassis front...
Contact Us

471-477 Great Eastern Hwy
Redcliffe, Perth WA
Phone: +61 8 9475 0200
Fax: +61 8 6210 1453
A.B.N: 6 116 999 387
Contact us via email:
enquiries@undergroundhire.com
or via our contact form.