R2900G#GLK503 super twenty [extra]
Rebuilt engine dyno test at westrac
Rebuilt transmission and dropbox
Rebuilt torque converter
Rebuilt both diffs rebuilt 4 x wheel ends
Rebuilt rear trunnion
Replace hydraulic pumps
Repaired all coolers replaced hoses as required
Overhauled 2x lift cyls, tilt cylinder and 2x steering cylinders
Strip and inspect main implement valve
All rims recertified
Removed old lip fitted a shark lip and new profile bar ix heel shroud boom Pins and collets replaced
Contact Underground Hire Services about this product